Bharatpur 226

Work Order for execution balance work of transmission main pipe line from Mallah (Bharatpur) to Kumher, Deeg, Kaman, Pahari, and Nagar and RWSS for 97 villages from Mallah head works under Chambal Dholpur Bharatpur Project and its operation and maintenence for 10 years on single point responsibility turnkey basis.

Image-empty-state.png

Sakti

Improvement & Augmentation of Existing Water Supply Scheme of Sakti’ Dist. Janjgir Champa, Chhatisgarh

Image-empty-state.png

Rajnandgaon

Design Drawing, Construction, Supply & Installation of E/M component under Mongra Multi Village Water Supply Scheme of 330 Villages

Image-empty-state.png

Etawah

Survey, Design, Preparation of DPR, Construction, commissioning and O&M for 10 years of various Rural Water Supply Projects

Image-empty-state.png

Tonk

Retro-fitting Work of Construction of New OHSRs, connecting these OHSRs with existing Rising Mains, Pipeline from OHSRs to VTCs, pipeline network inside the village, Providing Functional Household Connections including Geo tagging and O & M work (uptp VTC ), to be carried out under JalJeevan Mission(JJM) under Bisalpur-Tonk-Uniyara-Deoli Water Supply Project Package-IV".

Image-empty-state.png

Jaitaran

Supply of water from Sojat, Chandawal, Juntha(Raipur), Bar, Jaitaran, Nimajand A.P.Kallu Offtake for 133 Villages and Jaitaran Town Viz, construction of WTP, CWR, ESR,P, L&J of DI, BWSC & uPVC pipelines, Pumping Station and all related civil mechanical, electrical & instrumentation works, including Operation & Maintenance for 10 years.

Image-empty-state.png

Ladnun

Retro-fitting Work for providing Water Supply through FHTCs in 102 villages & dhanies (other habitations) of Ladnu Block, District Nagaur by work of rising mains, Construction of New OHSRs, connecting these new OHSRs with existing and new Rising Mains, P/L/J of Pipeline from OHSRs to VTCs, Design, P/L/J and commissioning of Internal village distribution network and providing Functional House Tap water connections including all material and all labour, thereafter 10 Years O & M of assets on Single point responsibility.

Image-empty-state.png

Sanchore

Execution of Earth Work, Single PCC Block Lining, Pucca structures, Diggies, Pump Rooms, Sump wells Boundary Wall & Supplying, Laying, Jointing & Commissioning of Distribution net work of High Density Poly ethylene (HDPE) pipes with electrically operated motor with desired accessories on system of Arwa, Ogala & Dudhwasan Minors of Panoriya Lift Distributary off-taking from 5.375 Km of Bhimguda Distributory of NMC including designing and layout of mechanical work on turnkey basis.

Image-empty-state.png

Barmer

Drinking Water Supply Project in Barmer District on Single Responsibility Turn  Key Lump Sum Based Contract, which includes providing, laying, jointing, testing and commissioning of Transmission and Cluster Distribution mains, RCC ground level/ elevated reservoirs, pumping arrangements, Monitoring and Control of flow with Meters, FCVs, PLC & SCADA, and allied activities on the risk & cost.

Image-empty-state.png

Balotra 4B

Work of providing, laying, jointing, testing and commissioning of clear water gravity trunkmain from Pokaran to Santra Bhakhri & from Santra Bhakhri to Balotra, Sindari & Siwana and allied works.

Image-empty-state.png

Birgaon

Design, Supply, Erection, Commissioning, Testing and trial run for 3 months complete for Augmentation Water Supply Scheme for Birgaon town including 9 months of Operation and Maintenance of exiting and proposed components of the project on TURNKEY Basis.

Image-empty-state.png

Hamirpur

Construction of Haraulipur Group of Villages Water Supply Scheme (Surface Water) and Electric/Solar based Piped Ground Water Supply Schemes (125 Nos) In villages of blocks (Gohand, Muskra, Sarila and Rath), District-Hamirpur with relevant works including Commissioning and Operation & Maintenance for 10 Years.